Owens Corning was building a state of the art 80,000 ton glass Melter at its existing facility in Mumbai.
Due to shortage of skilled welders and a tight timeline to inaugurate their new facility, they realized the need for a piping solution which can speedup their progress. Having used Pyplok® in the past (at their facility in the USA) and based on the time and manpower benefit it provides, they decided to go for Pyplok® to bring things on track.
Cenergy Offshore (CO) was asked to supply around 2000 Pyplok® fittings for the binder area lines and the utility piping lines. CO supplied the tools and technicians to carry out the installation of the fittings.
Pipe size ranged from 1/2” NPS to 2” NPS (Stainless Steel and Carbon Steel).
(Left) Pyplok® elbow installation (Right) Pyplok® on top routing lines
(Left) Cenergy Offshore personnel installing Pyplok® (Right) Installed Pyplok® fittings