Pyplok® Case Study: Removal and Repair of Clogged Deck Drain Line
Location of the project |
: |
Shell Sarawak Berhad– E11 Complex |
Scope of Work |
: |
Removal and Replacement of Clogged E11P-A Deck Drain Lines and to install new Pyplok® fittings |
Piping Specs |
: |
4”NPS Carbon Steel Line |
Pyplok Fitting Used |
: |
4”NPS Carbon Steel Straight Coupling (DP40N100G64) |
![](../images/pyplok/dp40n.jpg)
Pyplok® DP40N100G64 3D Model and Drawing
1. Cutting the pipe
![Identifying pipe to be cut - Replacement with Pyplok Fittings](../images/pyplok/repairing.jpg)
Identifying the pipe to be cut
![Surface Preperation to bare Metal - Replacement with Pyplok Fittings](../images/pyplok/surface-preparation.jpg)
Surface Preparation to bare Metal
![Cutting Pipe with Hack Saw - Replacement with Pyplok Fittings](../images/pyplok/cutting.jpg)
Cutting the pipe with hack saw
2. De-clogging the line
3. Pyplok® Installation
![Marking on the Pipe - Replacement with Pyplok Fittings](../images/pyplok/marking.jpg)
Marking on the pipe
![Marking on the Pipe - Replacement with Pyplok Fittings](../images/pyplok/marking-pipe.jpg)
Marking on the pipe
![Placing the Pyplok Fitting](../images/pyplok/placing.jpg)
Placing the Pyplok® Fitting
![Crimping the Pyplok - Replacement with Pyplok Fittings](../images/pyplok/crimping.jpg)
Crimping the Pyplok®
![Crimping the Pyplok - Replacement with Pyplok Fittings](../images/pyplok/crimpingpipe.jpg)
Crimping the Pyplok®
![Swage Dia Inspection - Replacement with Pyplok Fittings](../images/pyplok/inspection.jpg)
Swage Dia Inspection
![Secondary Marking Inspection - Replacement with Pyplok Fittings](../images/pyplok/secondary-inspection.jpg)
Secondary Marking Inspection
![Installed Pyplok Fitting](../images/pyplok/installed-pyplok.jpg)
View of the Installed Pyplok® Fitting