Hydraulic Hardline for NMDC Sinter Plant Granulator
Cenergy Offshore installed approximately 350 metres of pre-fabricated, non-welded hydraulic hardline for the granulator at NMDC’s Nagarnagar Steel Plant. The 315-bar system comprised pressure, return, drain and flushing lines using Tube-Mac flange technology.
Hydraulic Hardline for Granulator in JSPL Sinter Plant
Cenergy Offshore supervised the installation of approximately 350 metres of pre-fabricated, non-welded hydraulic hardline for JSPL’s Sinter Plant in Angul. Designed for 315 bar pressure, the system incorporated pressure, return, drain and flushing lines and was successfully tested and commissioned.