Application: Servo Hydraulic Test Systems

Hydraulic Hardline for Cummins Block and Head Test Rig

Cenergy Offshore designed and commissioned a non-welded hydraulic hardline system for Cummins’ Block and Head Test Rig Fatigue Laboratory. The 50-metre system served two high-pressure circuits up to 5,800 PSI and was engineered for the rig’s high-vibration operating environment.
car undergoing road testing in lab with hydraulic equipment

Hydraulic Hardline for Maruti Suzuki Strength Lab

A reliable hydraulic piping solution was required to ensure precise installation while meeting stringent cleanliness standards for dependable test-lab performance.

Hydraulic Hardline for Maruti Suzuki Vehicle Simulation Lab

Cenergy Offshore delivered approximately 500 metres of non-welded hydraulic hardline piping for Maruti Suzuki’s Vehicle Simulation Labs in Rohtak, integrating 4 Poster and 2 Poster test actuators. The system achieved NAS 0 cleanliness and passed pressure testing up to 4,500 psi.
school van undergoing road simulation with help of tube mac non-welded piping at ashok leyland technical centre

Hydraulic Hardline for Ashok Leyland Component Test Lab – Bay 2

Cenergy Offshore delivered the hydraulic hardline expansion for Ashok Leyland’s Component Test Lab – Bay 2, providing a pre-fabricated, non-welded high-pressure piping system for HPUs and test actuators, designed for vibration resistance, cleanliness and efficient installation.
Ashok Leyland Component Test Lab in Technical Centre, Chennai testing components with the help of Non-Welded Piping by Cenergy Offshore

Hydraulic Hardline for Ashok Leyland Component Test Lab – Bay 1

Cenergy Offshore delivered approximately 2 km of large-bore, non-welded hydraulic hardline piping for Ashok Leyland’s new Component Test Lab in Chennai. Serving 79 actuator points, the system was engineered for high-pressure operation, vibration resistance and hydraulic cleanliness, and was successfully flushed to NAS 5 and pressure tested up to 315 bar.

Hydraulic Hardline Piping for Ashok Leyland 8 Poster Lab

Cenergy Offshore upgraded Ashok Leyland’s 6 Poster Lab to an 8 Poster Lab with a vibration-resistant hydraulic hardline piping system. The project included FEA-validated supports, CFD analysis, pre-fabrication and installation, achieving NAS 6 cleanliness and pressure testing up to 4,500 psi.

Hydraulic Piping for ARAI’s Fatigue & Materials Lab

Cenergy Offshore delivered a complete non-welded hydraulic piping system for ARAI’s Material Fatigue Lab in Pune, covering design, supply, installation, flushing, cleanliness verification, pressure testing and commissioning using pre-fabricated piping from Canada.