Hydraulic Piping for ARAI's Fatigue & Materials Lab

Pune

2017

Cenergy Offshore delivered a complete hydraulic piping solution for ARAI’s Material Fatigue Lab in Pune. The project covered the design, supply, installation, flushing, and pressure testing of the hydraulic piping system.

The piping was pre-fabricated by Tube-Mac Piping Technologies (TMI) in Canada and shipped to the project site for assembly and installation. The project demonstrated Cenergy Offshore’s capability to deliver precision hydraulic piping systems using non-welded connection technologies.

Scope of Work

Cenergy Offshore was responsible for:

  • Hydraulic piping design
  • Supply of piping and connection components
  • Site assembly and installation
  • System flushing
  • Cleanliness verification
  • Pressure testing
  • Final commissioning and handover

Execution

The piping components were pre-fabricated in Canada and transported to the ARAI facility in Pune. Cenergy Offshore carried out the site assembly and installation of the piping system according to the project requirements.

Following installation, the system was flushed to achieve the required NAS cleanliness level. The completed piping system was subsequently pressure tested before being handed over to ARAI.

Project Outcome

The hydraulic piping system was successfully installed, flushed to the required cleanliness standard, pressure tested, and commissioned.

The project demonstrated Cenergy Offshore’s capability to execute non-welded hydraulic piping systems for demanding automotive testing applications, from engineering and supply through installation, flushing, testing, and commissioning.