The Samruddhi Mahamarg Tunnel project demonstrates the application of PreFiS® non-welded press-fit technology in a high-pressure water mist fire protection system, operating at pressures of up to 140 bar across approximately 8 km of tunnel infrastructure.

The Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg is one of Maharashtra’s major infrastructure projects. Package 14 includes twin-tube road tunnels extending approximately 7.7 to 8 km through the hydrogeologically challenging and eco-sensitive Kasara Ghat terrain in the Western Ghats.The tunnel fire protection system incorporates a high-pressure water mist network designed to provide effective fire suppression while significantly reducing water consumption compared with conventional deluge systems.

Operating at hydraulic pressures of up to 140 bar, the system uses stainless-steel tubing and specialised high-pressure components to distribute water mist throughout the tunnel. For such a large underground installation, conventional welded tubing presented challenges related to hot-work safety, material integrity, post-weld treatment and installation time. PreFiS® non-welded press-fit tubing technology provided an alternative cold-connection method, eliminating welding at the tubing joints while enabling rapid installation of the high-pressure stainless-steel network.

The Challenge : Welding in a Confined Tunnel Environment

Installing a high-pressure water mist network across an extensive tunnel presents a unique combination of pressure, safety, accessibility and installation challenges. The system operates between approximately 60 and 140 bar, requiring reliable tubing connections capable of maintaining integrity under high hydraulic pressure.  At the same time, the tunnel environment creates additional challenges for conventional welding.

Welding in a Confined Tunnel Environment

This introduces requirements for: a) Hot-work permits b) Ventilation and extraction c) Gas monitoring d) Fire-watch arrangements e) Welding-fume management f) Additional safety coordination For a large underground network, these requirements can add complexity to the installation process.

Protecting Stainless-Steel Integrity

The water mist network uses 316L stainless steel. Welding creates a heat-affected zone around the joint. The project analysis identifies sensitization and the resulting corrosion vulnerability as potential concerns for stainless-steel piping exposed to the humid subterranean environment.

Post-Weld Inspection

Conventional welded joints can require NDT, pickling and passivation before the piping system can be completed. Across a large piping network, these additional processes can significantly affect installation schedules.

The project therefore required a connection technology that could combine: High-pressure integrity + material preservation + installation speed + reduced hot work

PreFiS® Tubing Solution

To address these challenges, PreFiS® non-welded cold-press technology was used for the high-pressure tubing system. Unlike conventional welding, PreFiS® creates the connection through controlled mechanical deformation. A high-integrity metal sleeve is positioned over the tube ends and permanently compressed using a calibrated hydraulic press tool, creating a metal-to-metal mechanical seal without applying heat to the tubing.

stainless steel prefis fitting installed on pipe
PreFiS fitting installed on pipe

This provided four key advantages for the tunnel application.

No Welding

PreFiS® eliminates welding at the tubing connection. This removes hot-work activities from the connection process and reduces the associated requirements for ventilation, gas monitoring, fire watches and hot-work permits.

Preserved Material Integrity

The connection is produced through cold mechanical deformation rather than thermal joining. This avoids welding-related heat exposure and helps preserve the corrosion-resistant characteristics of the stainless-steel tubing.

Efficient Flow Path

The PreFiS® connection provides a smooth, step-free internal bore profile. For a high-pressure water mist network, this helps minimise flow disturbance and pressure losses through the extensive tubing system.

Rapid Installation

The hydraulic press connection can be completed in a fraction of the time required to prepare, weld and inspect a conventional TIG-welded joint. The project analysis records an installation time of approximately 2–5 minutes per press connection

Project Outcome : A Benchmark for Non-Welded Tunnel Piping

The Samruddhi Mahamarg tunnel project demonstrates how PreFiS® non-welded tubing technology can be applied to high-pressure fire suppression infrastructure in a demanding underground environment. With the system operating at pressures of up to 140 bar across approximately 8 km of tunnel infrastructure, the project required a tubing connection method capable of delivering reliable hydraulic performance while addressing the practical challenges of underground installation. By replacing conventional welded connections with cold-press PreFiS® fittings, the installation approach eliminated hot work at the tubing joints, avoided welding-related heat exposure and significantly reduced connection time. The project analysis estimates a 25–35% reduction in total installed cost, attributed to factors including reduced NDT requirements, elimination of hot-work ventilation overheads and shorter installation timeline

The project demonstrates the potential of non-welded tubing technology for large-scale underground fluid systems. By combining cold-press installation, high-pressure capability and stainless-steel tubing, PreFiS® provides an alternative to conventional welding where installation safety, material integrity and project speed are critical. The project documentation identifies the resulting system as a reliable and hydraulically optimised fire suppression network, with the non-welded approach enabling rapid installation while avoiding welding-related heat exposure.

Key Project Highlights

Implemented PreFiS® non-welded tubing technology

Samruddhi Mahamarg – Package 14

Twin-tube tunnel through Kasara Ghat

Approximately 8 km tunnel infrastructure

High-pressure water mist fire suppression system

Operating pressure up to 140 bar

316L stainless-steel tubing

Cold-press mechanical connections

No welding at tubing joints

Reduced hot-work requirements

Smooth internal bore profile

2–5 minute connection time

Installation timeline compressed by more than 60%

Estimated 25–35% reduction in total installed cost

Application in a challenging underground environment