Binder Area Piping for Owens Corning Glass Melter Facility

Taloja, Mumbai

2018

Cenergy Offshore Technician installing Pyplok on utility lines
Owens Corning’s Mumbai facility faced tight timelines and a shortage of skilled welders during the construction of an 80,000-ton glass melter. To accelerate progress, they adopted the Pyplok® piping solution, proven in their USA operations for fast and reliable installation. Cenergy Offshore supplied 2000 Pyplok® fittings, along with tools and skilled technicians, enabling efficient installation across binder area and utility piping lines in stainless steel and carbon steel, ranging from 1/2” to 2” NPS.
Pyplok crimping in Owens Corning Facility
(Left) Pyplok® elbow installation (Right) Pyplok® on top routing lines
Pyplok crimping in Owens Corning Facility
(Left) Cenergy Offshore personnel installing Pyplok® (Right) Installed Pyplok® fittings
Pyplok fittings crimped in Owens Corning Facility
Pyplok fittings successfully crimped in Owens Corning Facility